Centralised system with Sheen EVO 2.0 heat pump combined with 2000-litre storage tank and thermal solar panels for domestic hot water production, Intelliplant management and monitoring system.
The building and the challenge
In 2023 the condominium assembly decides to proceed with the energy requalification of the 36-apartment building from the 1960s with a total area of 4500 m2, located in the centre of Milan, in order to reduce running costs, by intervening on the existing air-conditioning system, based on 2 old boilers for heating and domestic hot water respectively, a chiller for cooling and distribution with radiators and fancoils.
The most important cost item to work on is that for domestic hot water production.